Yarmouth Drainage and Roadway Improvements

Long Pond Road Drainage Yarmouth, MA – Re-construction of existing road way in Yarmouth, MA to include:

  • Over 30 precast concrete drainage structures or leaching pits
  • Minor roadway width adjustments
  • 5,000 LF of granite curbing
  • 1,100 Tons of superpave bituminous pavement
  • Construction of 3,000 LF of new 5’ wide sidewalks
  • Milling of existing roadway surface
  • Bituminous Striping
  • Signal Crossings and sensor systems