Shore Drive Seawalls 2014

Shore Drive SeaWalls – CC obtains special permits with local engineer to rebuild existing rock revetments across the Cape. The Shore Drive Seawall project of 2014 included the rebuilding of 300 LF of rock revetment. CC established the toe stone at elevation -3.0 and topped the wall out at elevation 22.00. Construction of wall took just around 2 months.