East Bridgewater High School

East Bridgewater JR/SR High School – Construction of a new 240,000 Square foot middle school / high school building in East Bridgewater, MA. Project included the following site work highlights.

  • Cut and fill of 60,000 CY of material on-site
  • 32,000 Sq. yds of bituminous pavement for roads and parking
  • Tennis courts and synthetic turf field and track
  • Over 100 precast concrete drainage structures and 5,000 LF of RCP drain pipe ranging from 12” to 30” diameter
  • (2) large stormtech retention systems
  • 3,000 LF of 12” and 8” DI water main
  • Gravity sewer system including 10 precast structure and 8” SDR 35 pipe
  • Waste Water treatment facility include (6) 15,000 gallon or more tunnel tanks
  • Dewatering of 20 plus vertical feet using well point system
  • Little League, softball, baseball, and soccer fields
  • 25,000 Sq. feet of segmented block retaining walls